- Certified
- Experienced
- Trusted
Before you release the final payment
Renovation Inspection in Dubai
Independent inspection of completed renovation and fit-out work by RERA certified engineers, before you release the final payment. Photographic report with rectification notes in 24 hours.
4.9 from 108 Google reviews | 73,000+ inspections completed | RERA certified, DLD registered | We do not carry out renovation work | 24-hour report
Call +971 50 602 1830
- Developers we work with












The last invoice is the leverage
Why the Final Payment Is the Deadline
Your contractor has finished, the last invoice has landed, and something does not feel right. That invoice is the moment worth pausing on.
Once the final payment clears you still have your contractual and legal claims. What you lose is the one piece of leverage that costs you nothing to use. Money in your account is a conversation. Money in his account is a dispute.
Worth being straight about the payment structure. Retention is standard in UAE construction contracts, typically 10 percent released half on completion and half after the defects liability period. It is not legally mandated, and it is not standard in homeowner renovation contracts. If you did not negotiate it in writing you do not have any, and the final balance is all the leverage there is.
Two other clocks are running
Your developer or Owners Association refundable security deposit, usually AED 2,000 to 20,000, is released only after final inspection and as-built submission, and any contractual defects liability period runs from completion.
The message we get most often reads like this. The work finished last week, the contractor has sent the final invoice, and something about the second bathroom does not feel right, but there is nothing to point at. That is a one-day job for us, and the last week in which pointing at it costs you nothing.
Stage inspection
The Inspection That Has to Happen Before Tiling
If your wet areas are not tiled yet, book this one instead. It is the most valuable inspection on a renovation, and nobody else sells it.
What gets buried, and when
The expensive failures are not the ones you can see. They are the ones the next trade covers up: the waterproofing membrane, the screed, the MEP first fix, the duct runs above the ceiling.
Best practice is a 48-hour flood test on the membrane before any tiling starts, and PPR supply lines pressure-tested at 10 bar for 24 hours. Most homeowners never find out whether either happened, because by the time anyone asks the evidence is under a floor.
AED 2,000-5,000 membrane plus testing, per bathroom
AED 34,500 tiling and marine joinery laid on top
AED 70,700 total published Dubai Marina bathroom project
The economics make it urgent. A membrane plus testing costs around AED 2,000 to 5,000 per bathroom. In a real published Dubai Marina bathroom project totalling AED 70,700, the tiling and marine joinery on top came to AED 34,500. Reaching a AED 3,000 component afterwards means destroying the AED 34,500 first.
One shortcut worth naming: tiling directly over existing tiles seals ageing plumbing and failing waterproofing underneath, where nobody finds it until the ceiling below starts staining.
Done, and done right
What a Renovation Inspection Covers
The question changes with the job. On a new build it is “does this match the specification”. On a renovation it is “was it done, and done right, now that most of it is hidden”.
Wet areas and waterproofing
Membrane condition where still visible, falls and drainage slope after a wet area was relocated, thermal and moisture survey of walls and floors, silicone and grout sealing, threshold levels, and the ceiling below.
MEP: electrical, plumbing and AC
Distribution board changes and added circuits, RCD protection, circuit loading against the new kitchen and AC demand, water pressure after pipework alterations, chilled water pipe insulation, fan coil access, duct condition and airflow balance.
Finishes, tiling and joinery
Tile lippage and hollow tiles over new screed, gypsum cracking at joints, paint film and plaster consistency, joinery alignment, drawer runners and hinges, and whether the false ceiling has access panels where the services above it will need reaching.
Compliance and safety
Unsealed service penetrations, relocated sprinkler heads and smoke detectors in high-rise apartments, and visible signs the work went beyond what was permitted.
We use thermal imaging, moisture meters, non-destructive testing and, on villas and roofs, drone survey. Thermal imaging finds moisture behind a finish before it stains it, a moisture meter confirms it, and neither requires opening anything up.
Six failure modes we log most
What Actually Goes Wrong on a Dubai Renovation
Wet-area waterproofing
AED 60,000 and up
The costliest thing that goes wrong. Waterproofing failure at roof terraces and villas ranks as the most expensive defect category in Dubai property at AED 60,000 and up, with a hidden bathroom wall leak at AED 25,000 and up behind it.
In an apartment there is a third party. Failed wet-area waterproofing is among the leading causes of ceiling damp in Dubai apartments, and when it is your bathroom above someone else’s ceiling, the downstairs owner and the Owners Association have a claim against you, not your contractor.
Hollow tiles and lippage from new screed
Pattern, not presence
Tiles laid with dab-and-dot adhesive, or onto screed that had not cured, sound hollow underfoot. Not every void is a defect. Isolated hollowness can be acceptable, but a repeating pattern at the corners, voids across half a tile, or any hollowness in a wet area points to bedding failure. Full diagnostic here: are hollow tiles a defect.
Electrical circuits and distribution boards
Load added, never calculated
Renovations add load. A new kitchen, a bigger AC, more lighting, smart-home wiring. Circuits get added and boards changed, often with no load calculation behind it. Older Dubai villa stock frequently lacks adequate RCD protection to begin with, and undersized circuits do not announce themselves until something starts tripping on a hot evening.
AC ducts, diffusers and airflow balance
Almost nobody checks it
The one almost nobody checks. When a ceiling is rebuilt, ducts and diffusers get moved, which changes airflow distribution across the whole system. The system needs rebalancing afterwards and rarely gets it. The symptom is a room that will not cool after a renovation that never touched the AC unit.
Fire stopping, sprinklers and detectors in high-rise apartments
Coverage was designed around it
New pipework and cabling create penetrations through fire-rated construction, and those need fire stopping. Relocating a sprinkler head or smoke detector changes the coverage the system was designed around.
Whether Dubai Civil Defence formally requires a certificate for private residential work is disputed and varies by building and scope. Set that aside. If your renovation moved sprinklers, detectors or fire-rated ceilings in a tower, the fire system was altered, and that is worth verifying whatever paperwork was required.
Chilled water pipe insulation
It does not leak, it harvests
A chilled water pipe stripped of its insulation during a ceiling rebuild does not leak. It harvests water out of the air, continuously, all summer, and drips it onto whatever is below. We covered this case here: damp on an apartment ceiling.
Hollow tiles
Dab-and-dot adhesive or uncured screed. A repeating pattern points to bedding failure.
Board changes
Added circuits and a swapped board, often with no load calculation behind it.
Unsealed penetration
New pipework through fire-rated construction needs fire stopping. It rarely gets it.
Most owners assume the contractor handled it
Was Your Renovation Actually Permitted?
Most owners assume their contractor handled it. Some did.
What needs a permit in Dubai
The approval stack has layers.
- Apartments need an Owners Association or building FM NOC first.
- Villas and townhouses in Emaar, Nakheel, Damac or Meraas communities need a master developer NOC.
- Then the permit itself: Dubai Municipality through the Building Permit System for most of Dubai, Trakhees for Palm Jumeirah, JAFZA and Dubai South, and the Dubai Development Authority for its free zones.
- DEWA approval applies separately to load increases and added circuits.
After completion, DM and DEWA inspect and a Property Completion Certificate is issued alongside DEWA clearance. Ask your contractor for it. Most owners have never heard of it, which is exactly why it is worth asking.
Permit territory covers structural changes, wall removal or new partitions, MEP relocations, wet area moves, AC duct changes, facade alterations, balcony enclosure and villa extensions. Painting, flooring and fixture swaps generally do not, though flooring is community-dependent in apartments where it affects acoustic layers.
The rule worth remembering: if the work touched a wall, a ceiling slab, an electrical circuit, a plumbing line or the air conditioning, assume a permit was needed.
Only licensed, DM-approved contractors can apply for one, and Emaar maintains an approved contractor database that gate security checks. So the test is simple. If your contractor was not on the approved list, no permit was pulled, whatever you were told.
What happens if it was not permitted
Articles 26 and 28
Local Order No. 3 of 1999
Local Order No. 3 of 1999 governs, and it is specific. Article 28 provides fines of not more than AED 50,000, doubled for repeat violations, alongside utility disconnection and possible revocation of the contractor’s licence. Article 26 lets the authority order illegal works demolished and removed, carry that out directly, and recover the cost from the violator plus 20 percent in administrative fees.
Note where that lands. You are the owner and the permit holder, so enforcement reaches you first, and chasing the contractor afterwards is a separate job you fund yourself. That is the argument for inspecting while he still needs something from you.
At resale it is less dramatic than people claim. Unpermitted work does not block a DLD transfer, it stalls one. The developer NOC is a mandatory gate, so the real cost is delay, a demand to regularise, and a forfeited deposit.
One honest boundary. We inspect and document the physical work and flag anything that looks unpermitted. Permit and NOC records sit with the developer and Dubai Municipality, so we tell you exactly which approvals to request and what the paperwork should show.
Three things, one stronger than you think
What You Can Actually Do About It
Three things, and one is stronger than most people realise.
The warranty you have is the one in your contract
No UAE law mandates a workmanship warranty on a residential renovation. Twelve months is common where a defects liability period exists at all. If your contract is silent, so is your warranty.
Decennial liability probably will not help
Articles 821 to 824, Federal Decree-Law No. 25 of 2025
It is a real ten-year regime under Articles 821 to 824 of Federal Decree-Law No. 25 of 2025, and Article 823 voids any attempt to contract out of it. But it targets collapse and defects threatening the safety, solidity or structural integrity of a building. A failed shower membrane, hollow tiles and an unbalanced AC system sit outside it. A structural villa extension designed by an engineer is the edge case, and even that is untested.
The remedy that does help is Article 818(2) of the same law
Article 818(2), Federal Decree-Law No. 25 of 2025
You can demand corrective work within a reasonable timeframe, and if the contractor fails, you may rescind or engage a replacement at his expense, without court approval. You generally have to place him formally in default first, and a dated, photographed report is the evidence that makes that stand up.
If it escalates
The ladder runs: formal legal notice, a Dubai Municipality complaint against a licensed contractor, a consumer complaint via the Ministry of Economy on 800 1222 or Dubai DET at consumerrights.gov.ae, then Dubai Courts. One point most people get wrong: file before hiring a replacement, so the original defects are still there to be evidenced.
General information, not legal advice.
Documents to re-inspection
How a Renovation Inspection Works
Scope and document review
Send us the contract, the scope of works, the bill of quantities and any drawings. We inspect against what you were quoted and what was drawn, not against opinion. This is what turns “he says it is normal” into a checkable question.
On-site inspection by a certified engineer
Your engineer works the property room by room, photographs every defect in place with a location reference, and takes thermal and moisture readings across the wet areas and any wall bordering one.
Report in 24 hours
You get the report within 24 hours of the visit. Every item carries a photograph, a location, a severity rating and a rectification note, written in the language a contractor’s foreman will act on.
Contractor liaison
Where the contractor disputes an item, we set out the technical basis in writing, so the conversation stays about the work rather than who sounds more confident.
Re-inspection
Once rectification is reported complete, we return, verify each item line by line, and check nothing new was damaged in the process.
Booked as a separate visit. Ask for the re-inspection fee when you book. The same engineer runs every step and signs the report.
Most companies in this market describe the report. We would rather show you one.
Every report is dated, photographic and referenced to a location in the property. That combination is what makes it usable as evidence rather than as an argument, and it is what a formal notice needs behind it if things go that way.
It is written to be handed straight to your contractor. Not summarised. Forwarded.



Independent of the trade
Why Owners Choose Prime Inspections
We do not carry out renovation work
Worth saying plainly, because it is unusual here. Prime does not do renovations, fit-outs or repairs. We have no financial interest in how many defects the report contains, and nothing to sell you at the end.
Check that against whoever else you are considering. If the company inspecting the work also offers to fix what it finds, the incentive runs the wrong way.
Engineers, not technicians
Our inspections are performed by qualified engineers, not general technicians. A technician tells you the bedroom is not cooling. An engineer measures the airflow at the diffuser, checks whether the duct run was altered, and tells you the system needs rebalancing after the ceiling came down. Our engineering team is led by Mohammed Nadeem Maldar, Engineering Manager.
Licensed and certified
Licensed by the Dubai Land Department under the property inspection services activity and DED registered, with InterNACHI certified inspectors on every job. Precisely, since this market is loose with the wording: InterNACHI is a technical certification body, not a UAE regulator. The licensing authority is the DLD.
73,000+ inspections behind every report
73,000+ inspections across all seven emirates, covering more than AED 1 billion in property assets. 4.9 from 108 Google reviews. Thermal imaging, moisture meters, non-destructive testing and drone survey are standard, not add-ons.
4.9 on Google (108 Reviews)
- 4.9 from 108 Google reviews
- 73,000+ inspections completed
- RERA certified, DLD registered
- We do not carry out renovation work
- 24-hour report
We do not do renovation work. That matters more here than anywhere else we operate, because on a renovation the only other technical voice in the room is the person who did the work and is waiting to be paid.
Mohammed Nadeem Maldar, Engineering Manager
Who this is for
Who Books a Renovation Inspection
Owners whose work has just finished
and whose contractor has issued the final invoice.
Owners mid-renovation
who want the wet areas checked before tiling starts.
Villa owners who have extended or altered a layout
where the permit question matters most.
Landlords preparing a renovated unit to let
before a tenant finds the problem.
Buyers of a property someone else renovated
which is a different job and sits with our pre purchase property inspection.
Developers, consultants and fit-out companies
commissioning independent quality assurance on their own delivery. Same standard, same report, and we still do not do the work.
Priced on scope and property size
Renovation Inspection Cost in Dubai
Pricing depends on scope and property size.
Scope | Inspection from
Single bathroom or kitchen
AED 799
Full apartment renovation
AED 1,699
Full villa renovation
AED 4,299
Villa extension
AED 2,499
Pre-tiling stage inspection
AED 899
Prices exclude VAT. Your exact figure is confirmed against scope and unit size before booking, and it does not change after the visit.
The number that matters is the ratio
The number that matters is the ratio, not the fee. A bathroom renovation in Dubai runs AED 30,000 to 55,000, a two-bedroom apartment AED 100,000 to 180,000, a villa AED 300,000 to 800,000. Against those, the inspection is under two percent on a bathroom and well under one percent on a villa. Set it against a waterproofing rectification starting at AED 25,000 and the arithmetic stops being close.
Where renovation work concentrates
Renovation Inspections Across Dubai
Two kinds of property keep us busiest.
Villa communities where extensions and full refits are common
The Meadows, The Springs and The Lakes (roughly 2003 to 2007), Jumeirah Islands, Arabian Ranches (from around 2004), Emirates Hills, and independent mainland villas in Jumeirah, Umm Suqeim, Al Wasl and Al Safa.
- The Meadows
- The Springs
- The Lakes
- Jumeirah Islands
- Arabian Ranches
- Emirates Hills
- Jumeirah
- Umm Suqeim
- Al Wasl
- Al Safa
Apartment stock being upgraded
Dubai Marina (towers largely 2005 to 2012), Jumeirah Lake Towers (from around 2006), Discovery Gardens (2008), Downtown Dubai, Business Bay, Palm Jumeirah Shoreline, JVC and JVT.
- Dubai Marina
- Jumeirah Lake Towers
- Discovery Gardens
- Downtown Dubai
- Business Bay
- Palm Jumeirah Shoreline
- JVC
- JVT
Two local details worth knowing
Palm Jumeirah approvals go through Trakhees rather than Dubai Municipality, and independent mainland villas have no developer NOC layer at all, which is exactly why unpermitted work turns up there most often.
We also cover Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah, Fujairah and Umm Al Quwain. Our office is in Business Bay, at The Binary by Omniyat.
Verified Google reviews
What Dubai Owners Say
4.9 from 108 Google reviews.
Sayyid Alavi
“The snagging report was detailed and team prepare excellent report and helped to sort the defects with the developer.”
Google review
★★★★★
Nadya Ninis
“Great and very professional service done by inspector Farhan. Very fast to respond and submit the report.”
Google review
★★★★★
Adriana Prodan
“The team was efficient, and the reports were detailed and easy to understand.”
Google review
★★★★★
EXCELLENT Based on 70 reviews Posted on Sayed SSTrustindex verifies that the original source of the review is Google. Snagging experience was great,we appointed Prime inspections team for snagging of our property in Arabian Ranches 3,The Booking process was smooth and report was shared on sameday and was detailedPosted on GaijinTrustindex verifies that the original source of the review is Google. Excellent and polite inspectors. Very detailed reports and professional communication. I am absolutely satisfied with the work done. I definitely recommend itPosted on Nithiya KTrustindex verifies that the original source of the review is Google. Excellent service from start to finish! The inspectors were knowledgeable, professional, and incredibly thorough. The detailed report gave me confidence in my home-buying decision. I would to definitely recommend them to others.Posted on Sajna VibhinTrustindex verifies that the original source of the review is Google. We had our snagging and de Snagging for out apartment with Prime Inspection. They did a very detailed Snagging and de Snagging with a detailed report. Especially Mr. Farhan is a subject matter expert and did an amazing job. We really recommend this companyPosted on Bobby DTrustindex verifies that the original source of the review is Google. We are very satisfied with Prime Inspections. Highly reccomend this company for snagging and Inspections of the properties. Their team, especially Mr. Farhan Ahmed who has done the snagging for our property has done a commendable job and is extremely thorough. He made sure to rectify all the weak points in the property and his team has also done a very good job to identify it and sent the report to the property management team to fix it. Mr. Farhan Ahmed has been a very helpful hand and assisted with the procedure as we were new to this. He made it easy and super convenient for us and he took care of everything. We have given our second property to the same team! Excellent job and good customer service 👏Posted on zakkar karimiTrustindex verifies that the original source of the review is Google. Mohammed helped me to organise the snagging appointment with developer,he assisted me the authorization form for snagging and scheduling appointments;The inspectors were on time and report was shared with developer and was detailed with photos and comments against it;ai Highly recommend the team for the professional service.Posted on Lea AragonTrustindex verifies that the original source of the review is Google. We hired Prime Inspections for snagging of our new property in Dubai JVC, The team is well informed and punctual and the report was shared with photos and comments.It must have snagging service prior to Handover of property.Posted on Naeem KhanTrustindex verifies that the original source of the review is Google. Snagging servic was great and team was on time and report was shared with 24hrs and the report helped me to neigotiate with the seller and it provided peace of mind prior to confirming interest of purchase.Posted on Mishal FrancisTrustindex verifies that the original source of the review is Google. Farhan and Malik provided excellent and highly detailed property snagging;The booking process was smooth and we were kept well informed and they also understand developer snagging booking process and handle it all well.Good Experience.Posted on Ch FazalTrustindex verifies that the original source of the review is Google. We appointed them for the snagging of our villa in Nad Al Sheba and team was on time and the engineers were highly skilled and knowledgeable;Mohammed was able to answer all my questions an explained the operations and systems and the snagging process was smooth and insightful;Great team to work with.
Answers before you pay
Renovation Inspection FAQs
How much does a renovation inspection cost in Dubai?
Pricing starts from AED 799 and depends on scope, from a single bathroom to a full villa. Against the project: a bathroom renovation runs AED 30,000 to 55,000 and a villa AED 300,000 upward, so the inspection lands under two percent of most jobs.
When should I book a renovation inspection?
Before you release the final payment. If your wet areas are not tiled yet, book earlier: a pre-tiling inspection catches the waterproofing while it is still visible. Once the tiles are down, confirming that the membrane was done properly means taking them back up again.
Can I withhold the final payment until the defects are fixed?
Withholding is a contractual remedy, not an automatic right. It works cleanly if your contract carries a retention or milestone clause. Without one, your position rests on the contractor not having completed the agreed scope, and a dated report makes that argument defensible.
What if my contractor refuses to fix the defects?
Serve formal written notice placing him in default with a reasonable deadline. Under Article 818(2) of Federal Decree-Law No. 25 of 2025 you can then engage a replacement at his expense, without court approval. Beyond that: a Dubai Municipality complaint or Dubai Courts.
Do I need a permit to renovate my property in Dubai?
Yes for structural work, wall removal, MEP relocation, wet area moves, AC duct changes and layout alterations. Apartments also need an Owners Association or building FM NOC, and villas in developer communities a master developer NOC. Painting, flooring swaps and fixture changes generally do not.
What happens if the work was done without approvals?
Under Local Order No. 3 of 1999, fines run to a maximum of AED 50,000 and double for repeat violations, alongside utility disconnection and possible revocation of the contractor’s licence. The authority can also order the work removed and recover the cost plus 20 percent in fees.
Does my renovation contractor give a warranty?
Only if your contract says so. No UAE law mandates a workmanship warranty on a residential renovation, so any defects liability period is purely contractual, commonly twelve months where one exists at all. Decennial liability targets structural collapse and stability, not finishes or MEP work.
How do I know if the waterproofing was done properly?
Once the tiles are down you cannot see it. Best practice is a 48-hour flood test before tiling, and PPR supply lines pressure-tested at 10 bar for 24 hours. If your contractor has no flood test record, a thermal and moisture survey is the next best evidence.
Are hollow tiles a defect or is that normal?
It depends on the pattern. Isolated voids can be acceptable, but a repeating pattern at the corners, voids across half a tile, or any hollowness in a wet area points to bedding failure. On renovations the usual causes are dab-and-dot adhesive or uncured screed.
Can you inspect while the work is still ongoing?
Yes, and on a renovation it matters more than at any other stage. Waterproofing, MEP first fix and screed are all buried by the next trade, so a stage inspection is the only point at which they can be checked without demolition.
Explore More
Related Inspection Services
New Handover Snagging
Resale Property Inspection
Everything Checked
While the last invoice is unpaid
Book Before You Release the Final Payment
While the last invoice is unpaid, a defect is a conversation. After it clears, it is a claim you have to fund and pursue.
RERA certified engineers, independent of the trade, a photographic report in 24 hours, 73,000+ inspections behind it.
Prime Inspections & Snagging
The Binary by Omniyat, Office 1914-203
Business Bay, Dubai, United Arab Emirates
Phone: +971 50 602 1830
Email: connect@primeinspections.ae
Request Your Inspection Slot
Four fields. Tell us where the work has got to and we will book the right visit.
We reply within business hours. Report in 24 hours, so most owners can still inspect before the final payment clears.

